Fire Stopping
Survey, install and record suitable fire stopping around service penetrations and joints in fire-resisting walls and floors.
Discuss your project
Fire stopping with a clear record of the work
Pipes, cables and other services pass through the walls and floors that separate parts of a building. Where a fire-resisting element is penetrated, the detail around that opening needs an appropriate solution. Later service changes can also disturb an existing installation, leaving a property manager to establish what has changed and what needs attention.
Interseal UK undertakes new and remedial fire stopping as part of passive fire protection programmes. We support social housing providers, managing agents and project teams with surveys, recommendations, installation and agreed project records. Our work is planned around the building, its occupants and the required performance of each location.
Define the opening before selecting the system
A fire stopping product is one part of an installation detail. The wall or floor construction, service type, opening dimensions, configuration and required performance all influence whether a proposed solution is suitable. Different pipes or cable arrangements may need different details even within the same building.
Before work starts, establish the supporting information and any technical questions that need to be resolved. This may involve reviewing the fire strategy, available drawings, existing survey and relevant manufacturer evidence. Where the as-found condition differs from the proposed detail, it should be reviewed before installation proceeds.
Typical areas to discuss
An agreed package can address service penetrations, linear joints and remedial defects at compartment lines. Common project locations include service risers, plant areas, communal routes and areas affected by refurbishment or mechanical and electrical upgrades.
The scope might include:
- Reviewing an existing schedule or surveying accessible installations.
- Identifying openings and recording the condition found.
- Developing a remedial proposal using suitable supported details.
- Coordinating access, service interfaces and other trades.
- Installing the agreed systems and recording completed work.
- Identifying any remaining areas or issues for follow-up.
If the extent of defects is uncertain, a fire compartment survey may be the appropriate first step. Cavity and fire barrier systems within concealed voids have a different role and should be scoped accordingly.
Coordinate work in occupied buildings
Access is often the main practical constraint. A riser may serve several homes; a seal may be behind a fixed panel; nearby equipment may need attention from another trade. Agree permissions, any service isolation arrangements and the sequence of work before the installation team arrives.
Resident communications, protection of finishes, housekeeping and maintaining safe access all belong in the site plan. Our Fabrick Group case study describes survey and remedial work across occupied housing, including coordination with other trades during high-rise riser works.
Evidence that connects to each location
A usable record should help your team find an installation again. Agree the required location references, photographs, product details, installation information and drawing links at the start. Also confirm any inspection or certification requirements and how they apply to the specific package.
Our published portfolio experience includes registers of works, labelled installations, plan references and photographic records. The handover requirements for your project should be written into the agreed scope, including how incomplete or inaccessible items will be shown. This helps future maintenance teams understand what was installed and where further work remains.
What affects the quotation?
The number of openings is only one factor. Dimensions, substrate condition, service arrangements, the supported system detail and the ability to reach each location affect labour and materials. Access equipment, enabling works, waste removal, reinstatement and phased visits may also need to be included.
Send available drawings, a survey schedule and photographs with your enquiry. Identify forthcoming service alterations so that responsibility for protecting and reinstating fire stopping can be coordinated across the programme. Avoid assuming that every opening can be priced from the same generic rate.
For projects around Nottingham and Middlesbrough, or a wider portfolio, our team can discuss the next step. The quote preparation guide explains the information that helps us define the work.
Fire Stopping: your questions
Can one fire stopping product be used for every opening?
No. Suitability depends on the whole installation detail, including the supporting construction, services, dimensions and required performance. The proposed system needs evidence supporting the actual application.
Can you take over a schedule produced by a surveyor?
Yes, a clear survey schedule can form the starting point for a proposal. We will discuss the information available, any gaps in the scope and whether site verification is needed before agreeing the installation details.
What happens when new cables or pipes are installed later?
The effect on existing fire stopping needs to be considered as part of the alteration. Agree responsibility for review, suitable reinstatement and updated records with the project team before services are changed.
Plan fire stopping from survey to handover.